Skip to contentv0.1.0
PIMgate
Use case · Illustrative scenario

01 · CONSTRUCTION & INTERIOR PRODUCTS

Every panel, every tile — with its passport, its EPD and its data.

A manufacturer of flooring, wall and ceiling systems links environmental product declarations, declarations of performance and technical data to every article, prepares Digital Product Passports, and gives retailers and planners the data they now ask for.

“The architect needs the EPD, the retailer wants recycled content per SKU — and both live in a PDF that covers two hundred articles.”
SCENARIO · CONSTRUCTION PRODUCTS MANUFACTURER · ~30K SKU

02 · SITUATION

Sustainability data exists — just not per article.

The company makes flooring, wall and ceiling systems, acoustic panels, profiles and installation accessories. Around 30,000 articles: every product line in many formats, colors and surface finishes.

Technical data and marketing texts live in the PIM. Weights, packaging and country of origin live in the ERP. Environmental product declarations according to EN 15804 exist for each product family — as verified PDFs, plus structured exports from the life-cycle assessment work. Declarations of performance sit on the website as PDFs. None of this is linked per article.

Demand has changed. Builders' merchants and DIY retailers ask for sustainability attributes in their templates. Architects and planners need EPD indicators and BIM-relevant properties for building assessments. Technical wholesale wants ETIM. And the Digital Product Passport is expected to reach construction products as the revised EU Construction Products Regulation and the Ecodesign for Sustainable Products Regulation are implemented.

WHO ASKS FOR WHATRoleStatus
BUILDERS' MERCHANTS · DIYrecycled content, VOC class, origin, packagingRETAILER TEMPLATE (XLSX)
ARCHITECTS · PLANNERSEPD indicators, fire class, acoustic valuesPORTAL · OPEN DATA
BIM CONTENT TOOLSstructured propertiesFEED · API
TECHNICAL WHOLESALEETIM class and featuresBMECAT 2005
MARKET SURVEILLANCE · FUTUREpassport dataDPP · DATA CARRIER

03 · CHALLENGES

Where sustainability data gets stuck.

EPDs cover families, customers ask per SKU.

One declaration covers hundreds of articles. Which article belongs to which EPD — and which indicator applies — is known only to a few people.

Validity runs out quietly.

EPDs and certificates expire. Nobody notices until a planner uses an outdated value in a building assessment.

Every retailer template is different.

Sustainability fields, units and code lists differ per retailer; each request becomes a spreadsheet project.

Planners can't find structured data.

Values are buried in PDFs. BIM content tools and assessment software need properties as data, not as documents.

ETIM on top.

Technical wholesale requires ETIM classes and features for the same articles — maintained separately today.

The passport needs one record.

A Digital Product Passport pulls from PIM, ERP, EPD and declarations. Without one linked record per article there is nothing to build it from.

04 · THE PIM GATE SETUP

One record per article. Three modules on top.

PIM Gate combines PIM, ERP, EPD exports and declarations into one record per article, linking each article to its EPD by product-family rules and checking validity on every export. On that record run three modules: the Digital Product Passport, Open Data for planners and tools, and ETIM & BMEcat for wholesale. Retailer templates and the portal use the same data.

Digital Product Passport lifecyclePassport data assembled per product or batch, carried by a QR code, and opened at public, professional or authority access level with a versioned history behind it.Product / batchMS-12011Batch 2026-B-0418Passport recordMaterialsComposition · substancesOrigincountry_of_origin · supply chainConformityDeclarations · certificatesRepairSpare parts · instructionsRecyclingDisposal · take-backData carrierQR · GS1 Digital LinkAccess levelsPublicConsumer · basic setProfessionalInstaller · service dataAuthorityFull record · on requestImmutable historyAppend-only · every change timestamped and attributableESPR · DPP

Diagram. PIM, ERP, EPD exports and declarations feed PIM Gate, which builds one record per article and holds records with expired EPDs. Outputs are Digital Product Passports with data carriers and access levels, open data for planners, retailer sustainability templates, ETIM and BMEcat for wholesale, a portal for retailers and planners, and an API for BIM content tools.

Open data for planners and tools

The passport, from record to QR code

Open Data publishingA governed catalog filtered by selection rules, published as JSON-LD, versioned feeds, a read-only API and a GS1 identifier, read by search engines, marketplaces and AI agents.Governed catalogFull catalog20,418 SKUsValidated · versioned · entitledmessara.pimgate.aiSelection rulesWhat is public6,204 publishedPer market · per categoryOutputsschema.org/ProductJSON-LD on every pageVersioned feedsJSON · CSV · XMLPublic read-only APIGET /v1/productsGS1 Digital LinkResolvable product URLllms.txt · AI endpointMachine-readable indexConsumersSearch enginesMarketplacesComparison portalsAI assistantsPartnersPublic data is a deliberate selection, never the whole catalog

05 · WORKFLOW

From EPD file to passport scan.

  1. STEP 01

    PIM, ERP, EPD, declarations.

    Technical data from the PIM, logistics and origin from the ERP, EPD indicators and validity from structured LCA exports, declarations and certificates as documents with metadata.

  2. STEP 02

    Every article to its EPD.

    Rules assign articles to EPDs by product family, format range or material. Indicators are inherited per article; exceptions are handled explicitly and logged.

  3. STEP 03

    Validity at the gate.

    Expired EPDs or certificates hold the affected records before they reach passports, feeds or templates. Sustainability owners see what needs renewal.

  4. STEP 04

    ETIM and planner properties.

    Articles are mapped to ETIM classes for wholesale; fire class, acoustic and emission values become structured properties for planners and BIM content tools.

  5. STEP 05

    Build the Digital Product Passport.

    A passport record per product or batch, a data carrier on the product or packaging, access levels for public, professionals and authorities, and an immutable history.

  6. STEP 06

    Retailers, planners, open web.

    Retailer templates with sustainability fields go out on schedule; planners find data in the portal and via open data; tools pull through the API.

06 · MODULES & PORTALS

What this setup uses — and what is live today.

  • Ingestion XML · REST pull · scheduled SFTP

    PIM, ERP, EPD exports, document metadata

    LIVE
  • Canonical schema · attribute metadata (type, unit, locale, market flags)

    One record per article incl. sustainability attributes

    LIVE
  • Validation rules · held-for-review

    EPD and certificate validity

    LIVE
  • Digital Product Passport module

    Passport records, data carrier, access levels, history

    2026
  • Open Data module

    JSON-LD, feeds, public API for planners and tools

    2026
  • ETIM & BMEcat module

    ETIM mapping, BMEcat 2005 for wholesale

    2026
  • Customer Portal

    Retailers and planners: data sheets, EPD, DoP

    LIVE
  • Supplier Portal (optional, second portal module in M)

    Raw-material suppliers submit recycled content, origin and material declarations

    2026
  • Scheduled delivery · versioned exports

    Retailer sustainability templates

    LIVE
  • Versioned REST API /v1 · delta sync

    BIM content tools, website

    LIVE
  • Data-quality scoring dashboard

    Completeness of sustainability data

    ROADMAP

07 · EXPECTED EFFECTS

What typically changes.

Indicative

EPD per family in a PDF

EPD indicators available per article, with the source declaration linked.

Indicative

Expired declarations go unnoticed

Expired EPDs and certificates hold records at the gate.

Indicative

One spreadsheet project per retailer

Retailer templates generated from the same record, on schedule.

Indicative

Values buried in documents

Structured properties for planners, BIM content tools and assessment software.

Indicative

ETIM maintained separately

ETIM mapped on the same record, checked on every export.

Indicative

DPP as a future project

Passport records ready to build as requirements are specified.

Qualitative expectations for this scenario, not measured results. Regulatory requirements and their timing are defined by the EU and national authorities; PIM Gate provides the data layer.

08 · TYPICAL CONFIGURATION

Version M with all three data modules — at the bundle price.

Product data, sustainability, marketing and key accounts need 11–25 seats; 30,000 articles fall into the ≤ 100k band; five languages fit Version M. Booking DPP, Open Data and ETIM together saves 20% on the modules. Retailers and planners are portal users — unlimited. Indicative list price €28,440, EUR, annual prepayment, excl. VAT.

Stage/test tenant, half capacity: + €2,550 / year. Supplier Portal to collect material and origin data from raw-material suppliers: included in M as the second portal module. Without ETIM (DPP + Open Data only, no bundle): €25,800 / year. One-off onboarding from €5,000. See Pricing.
Item€ / year
Version M — 11–25 seats, ≤ 100k SKUs, 2 portal modules, 8 languages€10,200
Customer Portal for retailers and planners (included in M)incl.
Digital Product Passport module · ≤ 100k€9,600
Open Data module · ≤ 100k€6,000
ETIM & BMEcat module · ≤ 100k€7,200
Bundle discount, all three data modules (−20% of module subtotal)−€4,560
Indicative list price€28,440

09 · ROLLOUT

Link the data first. Then publish, then passport.

  1. 01

    WEEKS 1–3 · SCOPE

    WEEKS 1–3Data inventory. Which EPDs exist for which families, which sustainability fields retailers ask for, which ETIM classes apply, which data is public, professional or restricted.

  2. 02

    WEEKS 4–9 · ONE RECORD

    WEEKS 4–9Connect and link. PIM, ERP and EPD exports connected; EPD-to-article rules; validity checks; portal for retailers and planners with EPD and DoP per article.

  3. 03

    WEEKS 10–16 · PUBLISH

    WEEKS 10–16Retailers, wholesale, planners. Retailer templates, ETIM mapping and BMEcat, open data feeds and JSON-LD for planners and tools.

  4. 04

    FROM WEEK 17 · PASSPORT

    FROM WEEK 17DPP pilot. Passport records and data carriers for one product line; access levels agreed with compliance; extend line by line as requirements are specified.

Indicative plan. Module phases start when the modules are available for your tenant.

10 · NEXT STEP

Recognize your data gap? Book a scoping call.

Bring one EPD and the article list it covers. We show how it becomes per-article data, a retailer template row and a passport record.

11 · Keep reading

More on this scenario

2026

Digital Product Passport

PIM Gate assembles passport records per article or batch from your existing PIM, ERP and document data, shows you the gaps, and publishes each passport behind a QR code.

2026

Open Data

A governed, public slice of your catalog as structured, machine-readable product data — schema.org JSON-LD, versioned feeds and a read-only API. You decide what is public.

2026

ETIM & BMEcat

Classify once, deliver to every wholesaler — complete, in the right ETIM version, as full catalog or delta.

Put a gate between your catalog and chaos.